Dam & Roadway Improvement Project 2021 -2022
Photo Credit to Robert Pierpont
2021-06-08 – Drawing Set – Cedar Lake Dam – WOL2026.CE
*************************************************************************************************
Emergency Action Plan – Cedar Lake Dam 2020.pdf
***************************************************************************************************
Dam Inspection 2019
The Cedar Lake Dam had a professional inspection by a Connecticut licensed engineer in April of 2019. (Report was completed June, 2019).
The dam was inspected for:
- General / Overall Condition
- Concrete Condition
- Masonry
- Cracks
- Scouring
- Seepage / Foundation Drainage Condition
- Erosion
- Vegetative Cover
The final review listed the dam in “fair to good” condition related to all the above mention items.
- CLOA is responsible to create an Emergency Action Plan for the lake and this is expected to be completed July and will be posted on the website.
- The Dam/Roadway project has been approved by the Community Connectivity Grant Program and we were awarded $250,000.00 for the project. No official start date yet, but hopeful it will be a 2019 project.
Cedar Lake Dam Inspection Report December 2019
Cedar Lake Dam Project – WOL2026.CE
Previous Inspection Reports
Hydraulic and Hydrology Report 2014 – Cedar Lake Dam
Photos
Spillway Outflow Tunnel
Spillway Chamber and Weir Plate